The project comprises construction of an inlet station at Dublin Port , a reception station at Dublin Airport and a 200mm diameter continuously welded steel pipeline.
The route of the proposed pipeline is as follows
- Bond Drive
- Tolka Quay Road
- East Wall Road to the junction with the John McCormack Bridge
- Tolka River crossing
- Alfie Byrne Road
- Clontarf Road, Howth Road
- Copeland Avenue,
- Malahide Road (R107)
- R139 (N32)
- Clonshaugh Road North
- AUL/FAI Sports Grounds
- M1 Crossing,
- DAA Long Term Car Park (Red)
- ALSAA Sports Complex
- Swords Road
- Corballis Road.
This pipeline and associated facilities will be designed, built and operated in accordance with I.S. EN 14161:2011 - Petroleum and natural gas industries Pipeline transportation systems (ISO 13623:2009 modified).